| Customization: | Available |
|---|---|
| After-sales Service: | Quality Assurance |
| Warranty: | 1 Year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency


Loading station Sterilizing station
Threshing station Press station
Separation of shell kernel Boiler romm
Kernel oil press Oil Clarify
Water treatment Power station
(c)Sterilization. FFB will pass high pressure and high temperature sterilization after entering fermentation
|
Capacity |
98%-100%,450kg/h max |
|
Raw material |
Palm kernel,Palm |
Advatage
(1)High oil yield, low oil loss and high nutritional value.
(2)The damage to the environment is small and all parameters of the process are in line with national standards.
(3)The degree of automation is high, labor is saved, and the entire process consumes less energy and saves money.
FAQ
1.Q:Which kind of oil materials can be processed?
A: All kinds of oil seeds. For example of common oil material:soybean, rice bran, corn germ, cottonseeds, peanut,
sunflower, rapeseed, palm fruit etc.
2. Q:What's the input capacity of your machinery?
A: 5-2000 tons per day. the input capacity is according your plan or requirements to customized.
3. Q:The materials of your machinery?
A: The stainless steel and carbon steel.
4.Q:How should I do if meet some trouble while using?
A:we can supply English manual book and also take a video for showing how to resolve the problems or dispatch
our worker to your factory.
5. Q:Can you install the machine in local place?
A: We will send our engineers to local place to help installing the machine and provide technical guidance.
6.Q:how long can we receive the goods?
A:delivery about 45 working day after your order,have different shipping time of different machinery,and we will
inform you shipping time based on your seaport.